Items where Year is 2004
Number of items at this level: 144. AA., Faridah and A., Abdullah Sani and R., Ismail (2004) Bridging the Gap: Architecture and Structural Engineering. In: Conference On Engineering Education (CEE 2004), 14-15 December 2004, Kuala Lumpur. A. Aziz, Edriyana (2004) Environmental benefits of reusing wastewater in landscape watering : a case study of Sg. Melana. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Ab. Wahab, Mohd. Saupi (2004) Project Success factors for design-build system. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Abd Rahman, Norhan and Woei-Keong, Kuan (2004) Simulation Of Groundwater Flow And Pollutant Transport For Alluvial Aquifer In Kampung Tekek, Tioman Island. Jurnal Teknologi B (41B). pp. 21-34. ISSN 0127-9696 Abd. Majid, Muhd. Zaimi and M. S., Jamiah (2004) Engineering doctorate (EngD) programme at Universiti Teknologi Malaysia. In: Conference On Engineering Education (CEE 2004), 14-15 December 2004, Kuala Lumpur. Abd. Rahman, Ana Rozaininaida (2004) Masalah hubungan sub-kontraktor (domestik) dengan kontraktor utama dalam projek pembinaan. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Abdul Harnid, Abdul Rahim and Singh, Bachan and Wan Yusof, Wan Zulkifli and King, Andrain Tzee Yang (2004) Integration of safety, health, environment and quality (SHEQ) management system in construction : a review. Jurnal Kejuruteraan Awam, 16 (1). pp. 24-37. ISSN 0128-0147 Abdul Kadir, Aeslina (2004) Landfill leachate treatment performance in subsurface flow constructed wetlands using safety flow system. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Abdul Mukti, Mohamad Afifi and Mohd. Noor, Fatimah (2004) Engineering education - the hidden agenda. In: Conference On Engineering Education (CEE 2004), 14-15 December 2004, Kuala Lumpur. Abdul Rahim, Siti Mazlinah (2004) The application of precast concrete technology in industrialised building system (IBS). Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Abdul Samad, Zainuddin (2004) Pengurusan perkhidmatan bas berhenti-henti dan kemudahannya di Bandar Raya Johor Bahru. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Abu Bakar, Suhaimi and Saleh, Abd Latif and Mohamed, Zainai (2004) Factors affecting ultimate strength of solid and glulam timber beams. Jurnal Kejuruteraan Awam, 16 (1). pp. 38-47. ISSN 0128-0147 Abu Bakar, Abdol Fattah (2004) Peranan perunding pengurusan projek (PMC) dalam perlaksanaan projek pembinaan. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Ahmad, Hazrina (2004) The creep behaviour of high strength concrete. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Ahmad, Kamarudin (2004) Improvement of a tropical residual soil by electrokinetic process. PhD thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Ahmad, Yusof (2004) Teori struktur. Penerbit UTM, Skudai, Johor Bahru. ISBN 983–52–0326–1 Ahmad Tajudin, Saiful Azhar (2004) Ciri-ciri kejuruteraan, mineralogi dan mikrostruktur tanah liat lembut di Semenanjung Malaysia. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Ajit @ Abd. Aziz, Azilah (2004) Cadangan awal : perlaksanaan cleaner production (CP) dan promosinya kepada industri pemprosesan nenas. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Alagusundaram, Balasubramaniam (2004) Management related issues and challenges in steel pile repair works in marine structure : case study on the Sultan Salahuddin Abdul Aziz Power Plant in Kapar, Selangor. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. BBakhary, Norhisham and Yahya, Khairulzan and Ng Chin, Nam (2004) Univariate Artificial Neural Network In Forcasting Demand Of Low Cost House In Petaling Jaya. Jurnal Teknologi B (40B). pp. 67-75. ISSN 0127-9696 Bakhteri, Jahangir and Omar, Wahid and Makhtar, Ahmad Mahir (2004) Analysis of the reinforced concrete columns concealing rain water pipe in multi-storey buildings. Project Report. Universiti Teknologi Malaysia. (Unpublished) Bakhteri, Jahangir and Makhtar, Ahmad Mahir and Sambasivam, Shamala (2004) Finite element modelling of structural clay brick masonry subjected to axial compression. Jurnal Teknologi B (41B). pp. 57-68. ISSN 0127-9696 Belayutham, Sheila (2004) Kerja pembaikpulihan bangunan makmal komputer sekolah. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Bokhari, Normansah (2004) Pembaikan kerosakan dalam tempoh kecacatan : kajian kes : Jabatan Kerja Raya Daerah Kota Tinggi. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Buyu, Hashim (2004) Total quality management (TQM) a strategic necessity in construction project. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. CChan , Zhi Han (2004) 3D simulation of extended end plate wind-moment connection of beam to unstiffened column. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Che Puan, Othman (2004) Driver's car following headway on single carriageway roads. Jurnal Kejuruteraan Awam, 16 (2). pp. 15-27. ISSN 0128-0147 Che Seman, Syareena (2004) Improvement of quality product in housing development. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Chiew , Seng Khoon (2004) Control of materials on site. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Chik, Abdul Aziz and Che Puan, Othman and Chai, Ming Jing (2004) Entry and circulating flow relationship at a roundabout. Jurnal Kejuruteraan Awam, 16 (1). pp. 48-60. ISSN 0128-0147 Chong, Ming Yang (2004) Transactional and transformational leadership in context of Malaysian construction industry. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Chong , Voon Yaw (2004) A study of problems during construction stage for conventional housing project. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Chua , Jerry Kuo Sheng (2004) Classification of hard materials for contract documentation. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Chua , Tee Khoon @ Chua Yong Peng (2004) Critical factors that influence the success of implementing value management in Malaysian construction industry. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Chung , Keat Wei (2004) Information management to integrate cost and schedule for infrastructure projects. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. DD., Dwirianti-Hadiwinoto and Salim, M. R. and Ujang, Z. (2004) Polymerase chain reaction for identification of sulfate reducing bacteria species in membrane bioreactor. In: Environmental Biotechnology, Water and Environmental Management Series. IWA Publishing, London, pp. 173-184. ISBN 1843395037 GGoh, Hong Chun (2004) Alternative sewerage system in Malaysia : a new construction technology. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Goh , Meng Khiang (2004) Mediation as alternative dispute resolution : a study of professional's opportunities and challenges as mediators in Malaysian construction industry. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. HHairi Saad, Mohammad Syamsyul (2004) Kajian keberkesanan penswastaan projek melalui kaedah bina-kendali-pindah (BKP) di Malaysia. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Harahap, Mohamad Irwan Pandapotan (2004) Remedial works for a slope failure at the Faculty of mechanical Engineering, Universiti Teknologi Malaysia. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Haron, Ahmad Tarmizi (2004) Faktor kejayaan kaedah reka dan bina : kajian terhadap kontraktor. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Hii , Jing Song (2004) Nonlinear finite element analysis of the precast concrete beam-to-column connection. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Ho, Jin How and Abdul Rahman, Azlan (2004) Life cycle cost analysis case study on corrosion remedial measures for concrete structures. Jurnal Teknologi B (40B). pp. 15-26. ISSN 0127-9696 IIsmail, Nurul Adzura and Harun, Sobri and Yusop, Zulkifli (2004) Synthetic simulation of streamflow and rainfall data using disaggregation models. Jurnal Kejuruteraan Awam, 16 (2). pp. 56-65. ISSN 0128-0147 Ismail, Izan Kazura (2004) Dam break studies. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Ismail, Neza (2004) Design considerations, practices and problems : a survey of private consultant firm perspective. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. JJaafar, Izan (2004) The effectiveness of biochemical product in sewage treatment plant. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Janardhanan, J. Vijay (2004) Pengubahsuaian rumah di Daerah Johor Bahru Tengah. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. KKamal, Normadiah (2004) Project management for architects the learning outcome. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Kang , Seng Yiak (2004) Analysis of curved 2-D structures-application of structural morphology ideas. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Kassim, Khairul Anuar and Chem, Kok Kai (2004) Lime stabilized Malaysian cohesive soils. Jurnal Kejuruteraan Awam, 16 (1). pp. 13-23. ISSN 0128-0147 Kassim, Fauziah and Khatib, Anwar and Yusof, Mohd. Zain and Marto, Aminaton (2004) The grid mat method to increase bearing capacity of subgrade soil. Project Report. Faculty of Civil Engineering, Skudai, Johor. (Unpublished) Katimon, Ayob (2004) Water Table Management For Upland Crops: A Theoretical Modelling Investigation. Jurnal Teknologi B (40B). pp. 1-14. ISSN 0127-9696 Katimon, Ayob and Kassim, Azraai and Othman, Fadil and Sohaili, Johan and Yusop, Zulkifli and Hashim, Normala (2004) Agriculture drainage affects river water quality. IEM Journal, 65 (1/2). pp. 1-7. ISSN 0126-513X Katimon, Ayob and Demun, Amat Sairin (2004) Water Use Trend At Universiti Teknologi Malaysia: Application Of Arima Model. Jurnal Teknologi B (41B). pp. 47-56. ISSN 0127-9696 Kong , Yik Khai (2004) Application of transyt -7F in traffic management for local environment : study on delay. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Koo , Hong Kect (2004) Deflection profile check for a guyed monorail steel bridge. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Ku Ismail, Ku Adenan (2004) Recovery plan strategy on the delay construction project. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Kumaraweh, Inthiran (2004) Privatization of road maintenance in Malaysia : a case study. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. LLai , Chee Fong (2004) Wind loads on suspension bridge section using finite element analysis. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Lau , Chia Sing (2004) Poor construction documentation : causes and impact on client's organizations. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Lau , Guan Heng (2004) Construction coordination activities in local construction industry. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Lee , Chin Heng (2004) Just-in-time management of precast concrete building construction. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Lee , Kie Chiong (2004) Pembangunan perisian WASDA - SSF untuk olahan air larut lesap tapak pelupusan dangan menggunakan sistem tanah bencah buatan aliran sub-permukaan. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Lee, Yun Fook (2004) Rainfall effects to the performance of subsurface flow constructed wetlands in leachate treatment. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Liew , Eric Cheok Fai (2004) Implementation of microsoft project to improve conventional construction reporting system. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Lim , Chee Yang (2004) Coordination in construction industry : a study on factors leading to success and failure of it. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Lim , Leornard Lik Pueh (2004) Hydraulic performance of membrane bioreactor (MBR) for palm oil mill effluent treatment (POME) under aerobic conditions. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Lim , Wai Shien (2004) Application of EFCO E-form panel system RC shear wall design in Malaysia construction industry. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Lim , Wey Heng (2004) Precast construction database management system. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Ling, Jeng Ung (2004) The project manager's personal characteristic, skills and roles in local construction industry. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Lue , Henry Leong Shen (2004) Experimental modal analysis for structural health monitoring using diamond software. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. MMansur, Shaiful Amri (2004) Productivity assessment and schedule compression index for construction project planning. PhD thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Marto, Aminaton and Kasim, Fauziah and Yusof, Mohd. Fairus (2004) Ciri-ciri kejuruteraan tanah baki granit di Semenanjung Malaysia. Jurnal Kejuruteraan Awam, 16 (2). pp. 1-14. ISSN 0128-0147 Marwah, Mohd. Khatta (2004) Ciri-ciri kejuruteraan dan simulasi kelakuan tanah liat lembut di bawah tambakan cubaan Muar. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Mat Sah, Norkhairulnisa (2004) Penyediaan garis panduan tampalan jalan bagi jalan kampung. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Mat Sari, Norhazni (2004) Assessment of the licensing and inspection of scheduled wastes management facilities : case study : off-site recovery facilities in Johor. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Mawi, Saberi (2004) Kesan kandungan logam berat dalam kolam terhadap udang ternakan. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Mazlan, Elis Mardzianah (2004) Kecacatan bangunan perumahan : kajian punca dan penyelesaiannya. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Md Yusof, Aminah and Rahman, M.M. and Wood, Abdul Khalik (2004) Speciation of some trace elements in water samples after preconcentration on activated carbon by neutron activation analysis. Journal of Radioanalytical and Nuclear Chemistry, 259 (3). pp. 479-484. ISSN 0236-5731 Md Yusof, Aminah and Yanta, N.F. and Wood, Abdul Khalik (2004) The use of bivalves as bio-indicators in the assessment of marine pollution along a coastal area. Journal of Radioanalytical and Nuclear Chemistry, 259 (1). pp. 119-127. ISSN 0236-5731 Md. Abu Bakar, Norlinda (2004) Keberkesanan peranan Akademi Binaan Malaysia (ABM) dalam pembangunan industri binaan. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Md. Isa, Ahmad Hishamuddin (2004) Investigation on problems, issues and challenges of project management on marine concrete repair at TNB's power plant : a case study. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Md. Isha, Mohd. Nasir (2004) Evaluation on current practice in work breakdown structure approach for construction schedules. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Mesir, Baharin and Alel, Mohd. Nur Asmawisham and Mohd. Yunus, Mohd. Zulkifli and Ramli, Mohd. Zamri (2004) Perkembangan silibus teknologi maklumat didalam sistem akademik fakulti kejuruteraan awam, Universiti Teknologi Malaysia. In: Conference On Engineering Education (CEE 2004), 14-15 December 2004, Kuala Lumpur . Mohamad Zin, Rosli and Abd. Majid, Muhd Zaimi and Che Wan Putra, Che Wan Fadhil and Mohammed, Abdul Hakim (2004) Neural Network Model For Design Constructability Assessment. Jurnal Teknologi B (40B). pp. 27-40. ISSN 0127-9696 Mohamad Zin, Rosli (2004) Design phase constructability assessment model. PhD thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Mohamed, Azman (2004) Prestasi sambungan turapan penguncian blok konkrit menggunakan pasir pengalas dengan bahan tambah simen. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Mohammad, Shahrin and Md. Nor, Hasanan and Omar, Wahid and Mohamed, Danial (2004) Enhancing teaching and learning through the incorporation of generic skills for civil engineering undergraduates. In: Conference On Engineering Education (CEE 2004), 14 - 15 December 2004, Kuala Lumpur. Mohammad Sulanah, Nina Imelda (2004) The effect of opening on the strength of corrugated web plate girder subjected to shear. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Mohd Zain , Muhammad Fauzi and Islam, Md Nazrul and Salihudin, Radin Sumadi and Yap, S. G. (2004) Cement-based solidification for the safe disposal of blasted. Cement and Concrete Composites , 26 (7). pp. 845-851. ISSN 09589465 Mohd. Amin, Mohd. For and Khoo, Kai Siang and Chai, Hui Chon (2004) Reinforcement mechanisms of rock bolt : a laboratory investigation. Jurnal Kejuruteraan Awam, 16 (1). pp. 1-12. ISSN 0128-0147 Mohd. Hashim, Siti zaiton and Tokhi, Mohammad Osman (2004) ANFIS active vibration control of flexible beam structures. In: ASME 7th Biennial Conference on Engineering Systems Design and Analysis (ESDA2004). ASME, pp. 747-752. ISBN 0-7918-4173-1 Mohd. Hassan, Wan Hasitinaziah (2004) Penswastaan dalam industri pembinaan di Malaysia. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Mohd. Khalid, Rozline (2004) Tahap kepuasan dan harapan klien terhadap pengurus projek masa kini. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Mohd. Sarman, Asmawan (2004) Sistem kontrak reka dan bina : analisa implikasi arahan perubahan kerja ke atas kos dan masa. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Mohd. Yunus, Khairul Nizam (2004) Penggunaan kaca buangan sebagai agregat halus dalam turapan asfalt. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Mohd. Yusof, Mohd. Badruddin (2004) The effects of socio-economic characteristics on household wastes in Johor Bahru district. PhD thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Mokhtar, Nor Aieni and Kassim, Azman and Gofar, Nurly (2004) Combining design methodologies for the development of a practical and effective approach to erosion control systems. Project Report. Universiti Teknologi Malaysia. (Unpublished) Musta, Baba and Kassim, Khairul Anuar and Salim, Mohd. Razman and Ismail, Z'aba (2004) An investigation of heavy metals retention in lime stabilised soil. Borneo Science, 15 . pp. 1-13. ISSN 2231-9085 Mustaffar, Mushairry and Che Puan, Othman and Ling, Tung Chai (2004) Application of digital photogrammetry to quantification of road surface distresses. In: Malaysian Road Conference, 6th, 2004, Kuala Lumpur, Malaysia, 16-18 August 2004, Kuala Lumpur, Malaysia. NNg, Kuan-Seong and Ujang, Zaini and Le-Clech, Pierre (2004) Arsenic removal technologies for drinking water treatment. Reviews in Environmental Science and Bio/Technology, 3 (1). pp. 43-53. ISSN 1569-1705 Ng, Meng Wai and Camerlengo, Alejandro and Abdul Wahab, Ahmad Khairi and Harun, Sobri (2004) Estimation of evaporation and evapotranspiration in Malaysia using Penman and Christiansen methods. Borneo Science, 15 . pp. 23-36. ISSN 2231-9085 Ng , Meng Wai (2004) Variations of the Malaysian climate induced by global warming and ENSO events. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Ng , Sook Jen (2004) Nonlinear finite element analysis (NLFEA) of reinforcement concrete tube in tube tall building. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. OOmar, Noorliyana (2004) Aplikasi teknik pemprosesan imej digital untuk penilaian retak jalan. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Ong , Peck Ting (2004) Wastewater quality changes under anoxic conditions : a study on palm oil mill effluent (POME) addition in pressure sewer as external nitrate source. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. PPang, Sheh Haur (2004) The implementation of design and build procurement approach in local construction industry. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. RRahmat, Mohd. fua’ad and Hakilo, Ahmed sabit (2004) Flow regime identification using neural network based electrodynamic tomography system. Jurnal Teknologi, 40 . pp. 109-118. Ramli, Mohd. Zamri and Adnan, Azlan (2004) Earthquake engineering education plan for low intensity earthquake region. In: Conference On Engineering Education (CEE 2004), 14-15 December 2004, Kuala Lumpur. Rasiah, Kumarason V. (2004) Budaya keselamatan dalam pembinaan. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. SS. Abdullatif, Haidar (2004) Effect of magnetic field on carbohydrate in water samples. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Saed, Katayon and Megat Mohd Noora, Megat Johari and Liew Abdullah, Abdul Ghani and Salim, Mohd Razman and Nagaokad, Hiroshi and Ayad, Hidenori (2004) Pilot scale microfiltration - coagulation for treatment of retention pond water. Journal of Environmental Science and Health - Part A Toxic/Hazardous Substances and Environmental Engineering, 39 (8). pp. 2129-2142. ISSN 10934529 Safiee, Nor Azizi (2004) Modelling of steel-concrete composite beam sections of bridges using finite element method. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Salikin, Mohd. Tupar (2004) Kajian kes : kos tidak tepat di dalam pelaksanaan program bekalan air luar bandar. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Salleh, Kamarul Zaman (2004) Penilaian keperluan kelayakan tambahan perunding pengurusan projek (PPP). Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Samat, Shairul Rohaziawati (2004) Stochastic simulation of rainfall time series using disaggregation models. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Sambasivam, Pathmanathan (2004) Towards an effective bridge maintenance management system in Jabatan Kerja Raya Malaysia. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Samsuri, Mohd. Shah (2004) Penggunaan perisian penjadualan pegawai penyelia projek JKR Malaysia. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Sanusi, Saiful Rizan (2004) Tuntutan pembinaan. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Shaari, A. and Millard, S. G. and Bungey, J. H. (2004) Modelling the propagation of a radar signal through concrete as a low-pass filter. NDT&E International, 37 . pp. 237-242. Shamshuddin, Mustafa Kamal (2004) Lime stabilization of marginal soil as capping layer for road construction. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Shamsudin, Supiah and Kassim, Mohd. Azraai and Sohaili, Johan (2004) Reduction of nutrient contents by harvesting natural wetland vegetations. Jurnal Kejuruteraan Awam, 16 (2). pp. 28-41. ISSN 0128-0147 Shanmugam, Arvindran (2004) Monitoring and control methods for construction projects. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Sim , See Luen (2004) Deflection on ferrogrout I-beam : experimental and finite element method. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Soh , Tun Sian (2004) Aspek keselamatan dan kesihatan di tapak bina : antara amalan dan peruntukan. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Sukarti, Mohd. Yusof (2004) Kesan aliran masuk dan penyusupan terhadap sistem pembetung di beberapa kawasan taman perumahan di Johor Bahru. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Syamsuri, Efni Uslinda (2004) Pemilihan sub-kontraktor menggunakan kaedah logik fuzzi. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. TTaharin, Mohammad Radzif (2004) Pembinaan padang golf dan kemudahan berkaitan. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Tan , Ching Tiong (2004) Effect of the use of baffles on the performance of waste stabilisation ponds. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Tapsir, Siti Hamisah (2004) Structural fire engineering: investigation of gurun fire test (UTM, Perwaja Steel, Malaysian Structural Steel Association). Penerbit UTM, Skudai, Johor Bahru. ISBN 983–52–0352–0 Tay , Miaw Sze (2004) Penggunaan portal K-constructions dalam penghantaran dokumen secara berelektronik. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. UUjang, Zaini and Henze, M. and Curtis, Tom and Schertenleib, R. and Beal, L. L. (2004) Environmental engineering education for developing countries: framework for the future. Water Science and Technology , 49 (8). pp. 1-10. ISSN 0273-1223 WWagiman, Sukarno (2004) Imposeks dalam siput haliah, Thais sp. sebagai penunjuk biologi pencemaran tributiltimah di perairan Semenanjung Malaysia. PhD thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Wahono, Arie (2004) Kajian faktor-faktor yang mempengaruhi pencapaian subkontraktor dinamakan dalam proses pembinaan. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Wan Ab. Karim, Wan Mohd. Nasrudin (2004) Kelakuan sambungan lantai dan dinding dalam struktur kerja bata saling mengunci. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Wan Hamdan, Wan Samsul Zamani (2004) Design & build as project delivery system : the potential application in Bank Pembangunan & Infrastruktur Malaysia Berhad (BPIMB) factory complex's development. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Wong , Ing Hua (2004) Housing contractor problems and poor performance in Selangor's housing project. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. YYap , Sem Foh (2004) Construction labour productivity issues encountered by Malaysian construction industry. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Yong , Ee Ling (2004) Organics transformations in biofilm and bulk water under anoxic conditions for wastewater in sewer processes : a study on anaerobically digested palm oil mill effluent (POME) addition as external nitrate source. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Yong , Teck Choi (2004) Static strength of tubular T-joint. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. ZZainal Badri, Zaiton (2004) Mode of unstability of rock slope and methods of stabilisation. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Zainun, Noor Yasmin (2004) Computerized forecasting model based on artificial neural networks for low income group housing in urban area. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. Zanal, Azuawati (2004) Sewerage planning system. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. |