Universiti Teknologi Malaysia Institutional Repository

A systematic procedure for developing the 3D model to evaluate the construction project progress

Ahmed Memon, Zubair and Abd. Majid, Muhd. Zaimi and Mustaffar, Mushairry (2007) A systematic procedure for developing the 3D model to evaluate the construction project progress. Construction Innovation: Information, Process, Management, 7 (2). pp. 187-199. ISSN 1471-4175

[img] HTML - Published Version
226kB

Abstract

This main purpose of this study is to summarize the experience at the Construction Technology and Management Center (CTMC) to develop a Digitalizing Construction Monitoring (DCM) system by integrating 3DAutoCAD drawings and digital images. The objective of this paper is to propose a framework model for the DCM system and discuss in detail the steps involved for developing and calculating the 3D coordinate values from 2D digital images.

Item Type:Article
Uncontrolled Keywords:cameras, construction equipment, construction industry, construction operations, image processing equipment, Malaysia
Subjects:T Technology > TH Building construction
Divisions:Civil Engineering
ID Code:7973
Deposited By: Norshiela Buyamin
Deposited On:30 Mar 2009 04:24
Last Modified:15 Feb 2017 00:20

Repository Staff Only: item control page