Ahmed Memon, Zubair and Abd. Majid, Muhd. Zaimi and Mustaffar, Mushairry (2007) A systematic procedure for developing the 3D model to evaluate the construction project progress. Construction Innovation: Information, Process, Management, 7 (2). pp. 187-199. ISSN 1471-4175
|
HTML
- Published Version
226kB |
Abstract
This main purpose of this study is to summarize the experience at the Construction Technology and Management Center (CTMC) to develop a Digitalizing Construction Monitoring (DCM) system by integrating 3DAutoCAD drawings and digital images. The objective of this paper is to propose a framework model for the DCM system and discuss in detail the steps involved for developing and calculating the 3D coordinate values from 2D digital images.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | cameras, construction equipment, construction industry, construction operations, image processing equipment, Malaysia |
| Subjects: | T Technology > TH Building construction |
| Divisions: | Civil Engineering |
| ID Code: | 7973 |
| Deposited By: | Norshiela Buyamin |
| Deposited On: | 30 Mar 2009 04:24 |
| Last Modified: | 15 Feb 2017 00:20 |
Repository Staff Only: item control page

