Tajul Ariffin, Hamizah Liyana and Mohd., Norhazren Izatie and Mustaffa, Nur Emma and Bandi, Shamsulhadi and Cecelia, Ho Mei Chee (2019) Perspectives on issues and the application of the innovative procurement approaches for the Industrialised Building System (IBS). International Journal of Built Environment and Sustainability, 6 (1). pp. 39-43. ISSN 2289-8948
|
PDF
296kB |
Official URL: https://dx.doi.org/10.11113/ijbes.v6.n1.328
Abstract
Malaysia is making an aggressive effort of transformation to become a fully developed country. As one of the pillars for transformation, the construction industry has been undergoing a major reform with regard to the traditional method of construction. In recent years, the Industrialised Building System (IBS) has been promoted extensively with the government taking a lead with the practice. Studies showed that IBS has been able to expedite construction process, improve the time taken to accomplish a project, improve building quality, able to control cost and human resources, which in overall, raise occupational health and safety standard of construction. Despite, as most IBS projects were carried out under the traditional procurement method, the full benefits of IBS are somehow obscured. Several issues such as work delay, lack of communication and integration, lack of knowledge and increase in cost, which are synonymous to the traditional procurement method appear to outweigh the benefit of IBS. Hence, this research aims to suggest an alternative to the traditional procurement method with regard to IBS project implementation. The focus of this research has been on the challenges and innovative procurement methods most suited for IBS project. Two objectives were outlined: (1) to identify issues faced by client on current procurement method in IBS project; and (2) to identify the client’s perspective on innovative procurement method most suited for IBS project. Data for this research was collected through semi-structured interviews with five respondents from five major developers having experience in IBS project implementation. The results from the thematic analysis revealed that apart from the common issues which ascend from the sequential nature of the traditional procurement method, design integration issue was opined to aggravate the situation. Unanimously, respondents agreed that partnering is the way forward for IBS project implementation in Malaysian construction industry. This research contributes by providing important pointers for the local construction industry to move forward with IBS project implementation.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | IBS, Traditional procurement method, Issues, Client’s perspective, Innovative procurement |
Subjects: | T Technology > TH Building construction |
Divisions: | Built Environment |
ID Code: | 85106 |
Deposited By: | Fazli Masari |
Deposited On: | 04 Mar 2020 01:39 |
Last Modified: | 04 Mar 2020 01:39 |
Repository Staff Only: item control page