Nazir, R. and Moayedi, H. and Subramaniam, P. and Ghareh, S. (2017) Ground improvement using SPVD and RPE. Arabian Journal of Geosciences, 10 (23). ISSN 1866-7511
Full text not available from this repository.
Official URL: https://www.scopus.com/inward/record.uri?eid=2-s2....
Abstract
Excessive total and differential settlement at the intersection of a surcharged prefabricated vertical drain (SPVD) and a rigid piled embankment on soft ground during the post-construction period leads to considerable time and costs being spent on repetitive remedial works in the future. This paper presents a sustainable design approach for high and long embankment filling on soft clay at the approach to the structure by introducing the intersection of an SPVD at the transition to a rigid piled embankment in order to regulate the differential settlement between the two conventional ground treatment approaches. This paper also presents a full-scale field study to validate the performance of the intersection of the SPVD at the transition to the rigid piled embankment. By introducing the intersection ground treatment, post-construction settlement and differential settlement are minimised significantly, while the post-construction total settlement at the rigid transition piled embankment (TPE) zone is reduced significantly by about 80 to 95% of the total settlement, as compared to a conventional TPE.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Differential settlement, Embankment, Ground treatment, PVD, RPE |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Civil Engineering |
ID Code: | 75366 |
Deposited By: | Widya Wahid |
Deposited On: | 22 Mar 2018 11:05 |
Last Modified: | 22 Mar 2018 11:05 |
Repository Staff Only: item control page