Tey, Kim Hai and Lim, Shin Yee and Md. Yusof, Aminah and Chai, Chang Sa'Ar (2015) The implementation of construction cost index (CCI) in Malaysia. In: 9Th Asia Pacific Structural Engineering and Construction Conference (APSEC 2015), 3-5 Nov, 2015, Kuala Lumpur, Malaysia.
|
PDF
1MB |
Abstract
Cost performance is an important criterion in construction industry to determine a project success. In order to enhance the construction cost estimation and cost performance, Construction Cost Index (CCD is introduced. CCI serves as a business cycle measurement in budget preparation, cost modelling and cost forecasting in construction projects lifecycle. Although CCI has been introduced by Construction Industry Development Board (CIDB) over a decade however the cost performances for construction projects in Malaysia are still remain unsatisfactory. Therefore, this study aims at examining the causal relationship of CCI implementation success factors to address the effectiveness of CCI in Malaysian construction industry. Principal Component Analysis (PCA), ANOVA and T-Test are conducted to examine the factors of implementation of CCI in relation to CCI components. It is found that economic condition and reliability and validity of CCI are the major success criteria in implementing CCI. Also, it is discovered that Malaysian construction industry is ready to adopt CCI to improve the cost estimating performance.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Uncontrolled Keywords: | cost estimating, construction lndustry Malaysia |
Subjects: | T Technology > TH Building construction |
Divisions: | Civil Engineering |
ID Code: | 61831 |
Deposited By: | Widya Wahid |
Deposited On: | 26 Apr 2017 08:34 |
Last Modified: | 09 Aug 2017 08:46 |
Repository Staff Only: item control page