Muhammad, N. Z. and Keyvanfar, A. and Majid, M. Z. A. and Shafaghat, A. and Magana, A. M. and Lawan, H. and Balubaid, S. (2015) Assessment of cost escalation factors for building and civil engineering projects in Nigerian construction industry: A multiple regression approach. Jurnal Teknologi, 74 (4). pp. 85-91. ISSN 0127-9696
|
PDF
830kB |
Official URL: http://dx.doi.org/ 10.11113/jt.v74.4614
Abstract
Estimation of cost for building and civil engineering projects with minimum error at the conceptual stage of project development is crucial for planning. This paper evaluated the most significant cost escalation causing factors in building and civil engineering projects. Questionnaires were administered to clients, consultants and contractors to elicit information regarding their opinions with regard to these factors. Mean score value for each factor was determined. Also level of agreement of ranking of such factors between groups was investigated. The results of the analysis show that the most significant causes were the “Fluctuation of price of material” and “Variations” with the highest mean score values of 3.9 and 3.73 respectively. Also there was agreement in the opinions between all the groups with regard to these factors. A linear multiple regression models for the prediction of final cost of construction of building and civil engineering projects were developed using Statistical Package for Social Sciences (SPSS).
Item Type: | Article |
---|---|
Uncontrolled Keywords: | cost escalation, factors, multiple regression models |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Civil Engineering |
ID Code: | 57904 |
Deposited By: | Haliza Zainal |
Deposited On: | 04 Dec 2016 04:07 |
Last Modified: | 28 Oct 2021 07:37 |
Repository Staff Only: item control page