Chung , Keat Wei (2004) Information management to integrate cost and schedule for infrastructure projects. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
Full text not available from this repository.
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2004 |
Subjects: | T Technology > TH Building construction |
Divisions: | Civil Engineering |
ID Code: | 42401 |
Deposited By: | Haliza Zainal |
Deposited On: | 02 Nov 2014 02:37 |
Last Modified: | 02 Nov 2014 02:37 |
Repository Staff Only: item control page