Universiti Teknologi Malaysia Institutional Repository

The enforceability of liquidated and ascertained damages in construction contract

Chia, Eunice Mei Ling (2009) The enforceability of liquidated and ascertained damages in construction contract. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment.

Full text not available from this repository.


Item Type:Thesis (Masters)
Additional Information:Supervisor : Prof Madya Dr. Maizon Hashim; Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009
Subjects:Unspecified
Divisions:Built Environment
ID Code:18291
Deposited By: Kamariah Mohamed Jong
Last Modified:18 Nov 2011 04:32

Repository Staff Only: item control page