Universiti Teknologi Malaysia Institutional Repository

Factors affecting the delay in construction at Mentawai Island, Indonesia

Elfi, E. and Md. Tahir, Mahmood and Tukirin, Siti Asiah (2020) Factors affecting the delay in construction at Mentawai Island, Indonesia. In: 4th International Conference on Construction and Building Engineering and 12th Regional Conference in Civil Engineering, ICONBUILD and RCCE 2019, 20 August 2019 - 22 August 2019, Langkawi, Malaysia.

[img]
Preview
PDF
391kB

Official URL: http://dx.doi.org/10.1088/1757-899X/849/1/012015

Abstract

Currently, the construction sector became the backbone of the Indonesian economy, with infrastructure development being intensified in Indonesia. Construction of infrastructure projects and construction projects is generally overshadowed by project delays. The geographical position of the Mentawai Islands separated from the main island has the potential for project delays. This paper presents research on the factors causing project delays in the Mentawai Islands. The study was based on survey methods using questionnaires to stakeholders in construction projects in the Mentawai Islands. Of 77 respondents, was found that the main factors causing delays are weather problems, lack of manpower and incomplete planning documents.

Item Type:Conference or Workshop Item (Paper)
Uncontrolled Keywords:Mentawai Islands, delays, construction
Subjects:T Technology > TA Engineering (General). Civil engineering (General)
Divisions:Civil Engineering
ID Code:90746
Deposited By: Yanti Mohd Shah
Deposited On:30 Apr 2021 14:57
Last Modified:30 Apr 2021 14:57