Ng, Weng Seng (2001) Analysis of factors of non-excusable delays that influence contractors' performance. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
Full text not available from this repository.
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2001 |
Subjects: | T Technology > TH Building construction |
Divisions: | Civil Engineering |
ID Code: | 43173 |
Deposited By: | Haliza Zainal |
Deposited On: | 02 Nov 2014 03:29 |
Last Modified: | 02 Nov 2014 03:29 |
Repository Staff Only: item control page