Universiti Teknologi Malaysia Institutional Repository

Procurement method as conflict and dispute reduction mechanism for construction industry in Malaysia

Leong, Shiang Chin (2003) Procurement method as conflict and dispute reduction mechanism for construction industry in Malaysia. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.

Full text not available from this repository.

Official URL: http://libraryopac.utm.my/client/en_AU/main/search...

Abstract

Conflict and dispute management in construction is generally associated with disputes resolution techniques such as arbitration. Despite the effort to manage dispute have been and continue to be explored and develop, there has been an increased of initiation of arbitration and litigation cases signals. This indicates that the effort to minimize dispute should initiated as early as selecting the project delivery or procurement stage. This paper explores the potential of minimizing the frequency of dispute occurrence in project undertaking. A survey on 150 construction practitioners indicates that traditional method as the most commonly used procurement had the highest dispute rate compared to other innovative procurement methods such as design and build, construction management and partnering. The respondents suggest that the usage of innovative techniques is capable of reducing the frequency of dispute for construction industry. Hence, appropriate measures should be initiated to encourage the maximize utilization of innovative procurement methods in the construction industry

Item Type:Thesis (Masters)
Additional Information:Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2003
Subjects:T Technology > T Technology (General)
T Technology > TH Building construction
Divisions:Civil Engineering
ID Code:42734
Deposited By: Haliza Zainal
Deposited On:02 Nov 2014 03:13
Last Modified:13 Aug 2017 03:08