Universiti Teknologi Malaysia Institutional Repository

Data-base: harga bahan dan buruh binaan

Khalid, Abd. Ghani and Abdul Hamid, Razali and Mohd. Yusof, Zakaria and Misnan, Mohd. Saidin (2006) Data-base: harga bahan dan buruh binaan. Project Report. Faculty of Built Engineering, Skudai, Johor. (Unpublished)

[img] PDF (Full Text)
805kB

Abstract

Labour are the most important cost element in a construction project. However, the labor prices are not fixed in market. There are variation of price that can be offered by the contractor and sub-contractor. The price are different based on factors such as skill, types of project, location of project, demand and supply of labour, level of life, citizen, gender and races. For that reason, this study was carrying out to identify and compare the labour price in range and average aspect according to location and tred and also the factors which are influence it. The study scope only focuses in Terengganu, Johor and Kuala Lumpur. Research methodology that has been used for this study is questionnaire forms. The respondents are contractor and sub-contractor. From the findings, Kuala Lumpur is the location which offered the highest labour price which is RM90.00 compare with Terengganu and Johor. The treds which offered with high price by the all location are carpenter and joiner, plant operator, fitter, pneumatic tool operator, blasting operator and piling rigger. The result from analysis shown that the most influence factors for the variation of labour price are skill and location of project. While, races is the one factor which is almost not influence the variation of labour price.

Item Type:Monograph (Project Report)
Uncontrolled Keywords:Harga buruh, harga bahan, kos binaan
Subjects:T Technology > TH Building construction
Divisions:Built Environment
ID Code:3966
Deposited By: Noor Aklima Harun
Deposited On:18 Feb 2008 08:37
Last Modified:06 Aug 2017 08:43

Repository Staff Only: item control page