Maulana, Dimas (2011) The study on impact of project delay to construction cost. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment.
Full text not available from this repository.
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2011; Supervisor: Assoc. Prof. Dr. Razali Abdul Hamid |
Uncontrolled Keywords: | construction industry, cost control |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Built Environment |
ID Code: | 36848 |
Deposited By: | Kamariah Mohamed Jong |
Deposited On: | 03 Mar 2014 07:28 |
Last Modified: | 04 May 2014 09:29 |
Repository Staff Only: item control page