Teoh, Lay Eng (2005) Minimizing makespan and total weighted tardiness for job shop scheduling problem using shifting bottleneck heuristic. Masters thesis, Universiti Teknologi Malaysia, Faculty of Science.
Full text not available from this repository.
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | Thesis (Sarjana Sains (Matematik)) - Universiti Teknologi Malaysia, 2005 |
Subjects: | Unspecified |
Divisions: | Science |
ID Code: | 34892 |
Deposited By: | Kamariah Mohamed Jong |
Last Modified: | 17 Oct 2013 01:28 |
Repository Staff Only: item control page