Hameed, Aftab (2005) Resource-driven scheduling : barriers to implementation. Masters thesis, University Teknologi Malaysia, Faculty Of Civil Engineering.
|
PDF
88kB |
Abstract
Resource-driven scheduling techniques focus on resource. Their objective is to schedule activities so that a project deadline is met using predefined resource availability limits. This research was carried out to investigate the method of project scheduling being adopted in the construction industry, the status, factors affecting and barriers to implementation of resource-driven scheduling implementation in Malaysian construction industry. Survey was conducted to determine the level of resource-driven scheduling and factors affecting the concerned implementation. Construction Firms registered under G7 (A Class), G6 (B class) and G5 (C class) were used in the investigation. It is significant 59.6 percent firms are implementing resource-driven scheduling partially. The methods of project scheduling and resource options adopted were also investigated. A significant majority of construction firms (approximately 65%) adopted Microsoft project for scheduling. The research also focused on the barriers to implementation of resource-driven scheduling in construction projects. Lack of knowledge, no training session, budget allocation and uncertainty value were found very significant barriers
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | Thesis (Master of Science (Construction Management)) - Universiti Teknologi Malaysia, 2005; Supervisor : Dr. Rosli Mohamad Zin |
Uncontrolled Keywords: | construction industry, Malaysian |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Civil Engineering |
ID Code: | 3477 |
Deposited By: | Dina Amalia Nordin |
Deposited On: | 06 Jun 2007 04:19 |
Last Modified: | 26 Jun 2018 07:56 |
Repository Staff Only: item control page