Azmi, Afisza Irfan (2009) Contractor's application of extension of time in PAM 1998. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment.
Full text not available from this repository.
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2009; Supervisor : Prof. Madya Dr. Maizon Hashim |
Uncontrolled Keywords: | construction contract, extension of time |
Subjects: | T Technology > TH Building construction |
Divisions: | Built Environment |
ID Code: | 20180 |
Deposited By: | Kamariah Mohamed Jong |
Deposited On: | 01 Jan 2014 03:19 |
Last Modified: | 01 Jan 2014 03:48 |
Repository Staff Only: item control page