Kasim, A. Bakar (2003) Mengenal pasti sebab kelewatan kelulusan proses pra-pembangunan tanah (Tukar syarat dan pecah sempadan) dan cara mengatasinya. Masters thesis, Universiti Teknologi Malaysia, Faculty of Geoinformation Science And Engineering.
|
PDF
717kB |
Official URL: http://dms.library.utm.my:8080/vital/access/manage...
Abstract
There are lots of problems relating to the delay of approval of conversion and sub division of land in Malaysia. In 1983 YAB Deputy Prime Minister, Datuk Musa Hitam had complained about the delay and proposed the approval for conversion and sub division to be within six months. Theses issues appeared again in local newspapers from December 2002 until June 2003 and the writer took the responsibility to study tyhe reason for the delay. It is recommended that the procedures for the approval should be amended to suite the present requirement and steps should be taken to study how developed country solve the problems of delay.
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | Thesis (Sarjana Sains (Pentadbiran dan Pembangunan Tanah)) - Universiti Teknologi Malaysia, 2003 Supervisor - Assoc. Prof Dr Ismail Omar |
Uncontrolled Keywords: | sub division of land |
Subjects: | Unspecified |
Divisions: | Geoinformation Science And Engineering |
ID Code: | 19082 |
Deposited By: | Kamariah Mohamed Jong |
Deposited On: | 01 Oct 2017 00:55 |
Last Modified: | 10 Oct 2017 06:55 |
Repository Staff Only: item control page