Othman, Airennizah (2008) Main contractor's entitlement to an extension of time due to concurrent delay. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment.
Full text not available from this repository.
| Item Type: | Thesis (Masters) |
|---|---|
| Additional Information: | Supervisor : Dr Nur Emma Mustafa, En Jamaludin Yaakob; Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008 |
| Subjects: | Unspecified |
| Divisions: | Built Environment |
| ID Code: | 18062 |
| Deposited By: | Kamariah Mohamed Jong |
| Last Modified: | 18 Nov 2011 04:31 |
Repository Staff Only: item control page

