Othman, Airennizah (2008) Main contractor's entitlement to an extension of time due to concurrent delay. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment.
Full text not available from this repository.
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | Supervisor : Dr Nur Emma Mustafa, En Jamaludin Yaakob; Thesis (Sarjana Sains (Pengurusan Kontrak Pembinaan)) - Universiti Teknologi Malaysia, 2008 |
Subjects: | Unspecified |
Divisions: | Built Environment |
ID Code: | 18062 |
Deposited By: | Kamariah Mohamed Jong |
Last Modified: | 18 Nov 2011 04:31 |
Repository Staff Only: item control page