Universiti Teknologi Malaysia Institutional Repository

Productivity rate of roof works for JKR school project scheduling

Rijal , Zuraida Zaini (2010) Productivity rate of roof works for JKR school project scheduling. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.

Full text not available from this repository.

Official URL: http://libraryopac.utm.my/client/en_AU/main/search...


Item Type:Thesis (Masters)
Additional Information:Supervisor : Prof. Dr. Muhd. Zaimi Abd. Majid; Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia 2010
Subjects:T Technology > TA Engineering (General). Civil engineering (General)
Divisions:Civil Engineering
ID Code:16643
Deposited By: Zalinda Shuratman
Deposited On:26 Sep 2017 07:17
Last Modified:26 Sep 2017 07:17

Repository Staff Only: item control page