Universiti Teknologi Malaysia Institutional Repository

Kelewatan proses pengambilan tanah - kesan terhadap kontraktor

Fakharazi , Mohammad Faazil (2010) Kelewatan proses pengambilan tanah - kesan terhadap kontraktor. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.

Full text not available from this repository.

Official URL: http://libraryopac.utm.my/client/en_AU/main/search...


Item Type:Thesis (Masters)
Additional Information:Supervisor : Prof. Madya Dr. Aminah Md. Yusof; Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia 2010
Subjects:T Technology > TA Engineering (General). Civil engineering (General)
Divisions:Civil Engineering
ID Code:16503
Deposited By: Zalinda Shuratman
Deposited On:03 Aug 2017 06:57
Last Modified:03 Aug 2017 06:57

Repository Staff Only: item control page