Fakharazi , Mohammad Faazil (2010) Kelewatan proses pengambilan tanah - kesan terhadap kontraktor. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
Full text not available from this repository.
Official URL: http://libraryopac.utm.my/client/en_AU/main/search...
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | Supervisor : Prof. Madya Dr. Aminah Md. Yusof; Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia 2010 |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Civil Engineering |
ID Code: | 16503 |
Deposited By: | Zalinda Shuratman |
Deposited On: | 03 Aug 2017 06:57 |
Last Modified: | 03 Aug 2017 06:57 |
Repository Staff Only: item control page