Universiti Teknologi Malaysia Institutional Repository

Analysing the project delay causes and improving quality using multi-project strategies.

Azman, Nur Amirah Syahirah and Ramlie, Faizir and Wan Muhamad, Wan Zuki Azman and Abu, Mohd. Yazid and Harudin, Nolia (2023) Analysing the project delay causes and improving quality using multi-project strategies. Journal of Advanced Research in Business and Management Studies, 34 (1). pp. 23-34. ISSN 2462-1935

[img] PDF
968kB

Official URL: http://dx.doi.org/10.37934/arbms.34.1.2334

Abstract

Numerous reasons for project delays from the viewpoints of the client and the contractor have only been somewhat studied. The aim of this paper is to recognize the delays' underlying causes and issues ways to reduce them considering the progress of the project. Consequently, 106 contractor-side experts and 82 client-side experts in project management were the subjects of this study. The clients and contractors gave the same importance to factors like poor communications and governmental approvals in projects that were successful (had a time delay of less than 10%). Similar mitigating techniques including rigorous project monitoring, skill development training, and effective logistics planning were advised. When projects were unsuccessful (with a time delay of more than 10%), they displayed a wide range of behaviours.

Item Type:Article
Uncontrolled Keywords:project management; delay management; mitigation strategy.
Subjects:T Technology > TA Engineering (General). Civil engineering (General)
Divisions:Razak School of Engineering and Advanced Technology
ID Code:108785
Deposited By: Muhamad Idham Sulong
Deposited On:09 Dec 2024 06:20
Last Modified:09 Dec 2024 06:20

Repository Staff Only: item control page