Universiti Teknologi Malaysia Institutional Repository

The implementation of Integrated Management Systems (IMS) in construction organizations in Malaysia

Ramli, Nor Fazira and Haron, Nuzul Azam and Ales@Alias, Aidi Hizami and Harun, Aizul Nahar (2023) The implementation of Integrated Management Systems (IMS) in construction organizations in Malaysia. Malaysian Journal of Civil Engineering (MJCE), 35 (3). pp. 1-9. ISSN 2600-9498

[img] PDF
640kB

Official URL: http://dx.doi.org/10.11113/mjce.v35.20094

Abstract

An Integrated Management System (IMS) combines different management systems into one complete system. This paper aims to determine the intention and effectiveness of the IMS being implemented in construction organizations in Malaysia. The problem statement in this study is the number of documents in IMS still needs to be more prominent since the adoption of the standard still needs to be improved. This study aims to give awareness to the company so that they understand their intention to implement the IMS and the effect that will get on the implementation process. This study also will provide a framework that will be a guideline for the company to start with the implementation process and be certified as an IMS company. This study used quantitative and qualitative study methods. The study takes place on the construction company in Klang Valley that implemented the IMS. The survey has been done for the quantitative study to check on the understanding of the company for the intention and effectiveness of the IMS implementation. Meanwhile, for the qualitative study, the semi-structured interview session was done with five subject matter experts (SMEs) in the IMS implantation. The interview validates the research process and the framework's effectiveness. As a result, the study helps the companies to clearly understand their intention to implement the IMS and the effectiveness of IMS in their companies. The framework design also will help the company to have proper guidelines starting from the implementation until the continuous improvement after certification by the certification body.

Item Type:Article
Uncontrolled Keywords:Integrated Management System (IMS), construction management, project management, management system, International Organization Standard (ISO)
Subjects:T Technology > TA Engineering (General). Civil engineering (General)
Divisions:Malaysia-Japan International Institute of Technology
ID Code:108528
Deposited By: Yanti Mohd Shah
Deposited On:13 Nov 2024 06:35
Last Modified:13 Nov 2024 06:35

Repository Staff Only: item control page