Ahmad Dar, Eajaz and Brar, A. S. and Dar, Showket A. and Aljuaid, Bandar S. and El-Shehawi, Ahmed M. and Rashid, Rizwan and Shah, Zahoor A. and Yousuf, Abrar and Bhat, Mohammad Amin and Ahmed, Mushtaq and Ahmad Bahar, Fayaz and El Enshasy, Hesham and Brestic, Marian and Barboricova, Maria and Zivcak, Marek and Farooq, Shahid and Ansari, Mohammad Javed (2021) Quantitative response of wheat to sowing dates and irrigation regimes using ceres-wheat model. Saudi Journal of Biological Sciences, 28 (11). pp. 6198-6208. ISSN 1319-562X
|
PDF
1MB |
Official URL: http://dx.doi.org/10.1016/j.sjbs.2021.06.074
Abstract
An experiment was conducted at Punjab Agricultural University, Ludhiana during 2014–15 and 2015–16, keeping four sowing dates {25th Oct (D1), 10th Nov (D2), 25th Nov (D3) and 10th Dec (D4)} in main plots and five irrigation schedules {irrigation at 15 (FC15), 25 (FC25), 35 (FC35) and 45 (FC45) % depletion of soil moisture from field capacity (FC) and a conventional practice} in sub plots. The objective of the study was to evaluate the performance of CERES-Wheat model for simulating yield and water use under varying planting and soil moisture regimes. The simulated and observed grain yield was higher in D1, with irrigation applied at FC15 as compared to all other sowing date and irrigation regime combinations. Simulated grain yield decreased by 19% with delay in sowing from 25th October to 10th December because of 8% reduction in simulated crop evapotranspiration. Simulated evapotranspiration decreased by 16%, wheat grain yield by 23% and water productivity by 15% in drip irrigation at 45% depletion from field capacity as compared to drip irrigation at 15% of field capacity. It was further revealed that the model performed well in simulating the phenology, water use and yield of wheat.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | crop modelling, water management, wheat |
Subjects: | Q Science > Q Science (General) |
Divisions: | Science |
ID Code: | 94478 |
Deposited By: | Yanti Mohd Shah |
Deposited On: | 31 Mar 2022 15:46 |
Last Modified: | 31 Mar 2022 15:46 |
Repository Staff Only: item control page