Universiti Teknologi Malaysia Institutional Repository

Implementation of Karakuri Kaizen to improve productivity and ergonomics in wire rope industry

Madisa, I. M. and Taib, M. F. M. and Reza, N. A. (2019) Implementation of Karakuri Kaizen to improve productivity and ergonomics in wire rope industry. In: 9th International Conference on Industrial Engineering and Operations Management, IEOM 2019, 5-7 March 2019, JW Marriott Hotel Bangkok, Thailand.

[img]
Preview
PDF
1MB

Official URL: http://www.ieomsociety.org/ieom2019/papers/593.pdf...

Abstract

Wire rope manufacturing industry in Malaysia is thriving and demands are rising for the products. Productive workers are needed to fulfill the work orders however, the existing work stations designs have detrimental effects on workers' health. This is because the productivity level is always linked to the wellbeing of the workers. In response, Karakuri Kaizen concept implementations has been selected to improve the current workstation designs. The relationship between Karakuri Kaizen with productivity and ergonomics during the concept implementations is studied. A case study on the proposed concept had been performed in a wire rope manufacturing factory by means of questionnaire and experiments concerning both previous and improved workstation designs. Validation of the results are done by using productivity reports throughout the year, REBA analysis and Paired Samples t-test. Reba analysis shows significant improvement from REBA Level 3 and 4 on previous designs to Level 2 after concept implementation. Productivity increases around 5.8% throughout the study. Compelling differences between two samples have also been recognized through Paired Samples t-test. Therefore, the implementation of Karakuri Kaizen concept on the workstation designs has positive impacts on both productivity and ergonomics in wire rope manufacturing industry dictated by the results of this study.

Item Type:Conference or Workshop Item (Paper)
Uncontrolled Keywords:ergonomics, Karakuri Kaizen and wire rope, productivity
Subjects:T Technology > TJ Mechanical engineering and machinery
Divisions:Mechanical Engineering
ID Code:90979
Deposited By: Narimah Nawil
Deposited On:31 May 2021 13:21
Last Modified:31 May 2021 13:21

Repository Staff Only: item control page