A systematic approach for monitoring and evaluating the construction project progress

Memon, Zubair Ahmed and Abd. Majid, Muhd. Zaimi and Mustaffar, Mushairry (2006) A systematic approach for monitoring and evaluating the construction project progress. The Journal of The Institution of Engineers, Malaysia, 67 (3). pp. 26-32. ISSN 0126-513X

[img]
Preview
PDF
1MB

Official URL: http://www.myiem.org.my/content/journal-122.aspx

Abstract

A persistent problem in construction is to document changes which occur in the field and to prepare the as-built schedule. In current practice, deviations from planned performance can only be reported after significant time has elapsed and manual monitoring of the construction activities are costly and error prone. Availability of advanced portable computing, multimedia and wireless communication allows, even encourages fundamental changes in many jobsite processes. However a recent investigation indicated that there is a lack of systematic and automated evaluation and monitoring in construction projects. The aim of this study is to identifytechniques that can be used in the construction industry for monitoring and evaluating the physical progress, and also to establish how current computer technology can be utilised for monitoring the actual physical progress at the construction site. This study discusses the results of questionnaire survey conducted within Malaysian Construction Industry and suggests a prototype system, namely Digitalising Construction Monitoring (DCM). DCM prototype system integrates the information from construction drawings, digital images of construction site progress and planned schedule of work. Using emerging technologies and information system the DCM re-engineer the traditional practice for monitoring the project progress. This system can automatically interpret CAD drawings of buildings and extract data on its structural components and store in database. It can also extract the engineering information from digital images and when these two databases are simulated the percentage of progress can be calculated and viewed in Microsoft Project automatically. The application of DCM system for monitoring the project progress enables project management teams to better track and controls the productivity and quality of construction projects. The use of the DCM can help resident engineer, construction manager and site engineer in monitoring and evaluating project performance. This model will improve decision-making process and provides better mechanism for advanced project management.

Item Type:Article
Uncontrolled Keywords:AutoCAD, construction management, database, digital monitoring photogrammetry
Subjects:T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions:Electrical Engineering
ID Code:8056
Deposited By: Zalinda Shuratman
Deposited On:25 Mar 2009 06:09
Last Modified:23 Oct 2017 06:49

Repository Staff Only: item control page