Universiti Teknologi Malaysia Institutional Repository

Integrated collaborative tools for precast supply chain management

Abedi, M. and Fathi, M. S. and Mirasa, A. K. and Rawai, N. M. (2016) Integrated collaborative tools for precast supply chain management. Scientia Iranica, 23 (2). pp. 429-448. ISSN 1026-3098

[img]
Preview
PDF
3MB

Official URL: https://www.scopus.com/inward/record.uri?eid=2-s2....

Abstract

Precast construction projects are associated with many activities, numerous parties, enormous effort, and different processes. For effective communication, this requires delivering appropriate and up-to-date information to enhance collaboration and improve integration. The purpose of this paper is to develop the system architecture and prototype of Context-Aware Cloud Computing Building Information Modelling (CACCBIM) for precast supply chain management. The findings of this research are grounded on the literature of cloud computing, context-awareness, building information modelling, and, ultimately, the analysis of interviews with stakeholders in precast construction. Findings determine that lack of integration, improper planning and scheduling, poor production timing, poor coordination, lack of good communication among parties, wrong deliveries, and poor control and supervision are the major issues within the precast supply chain. These issues could result in adverse consequences for the objectives and success of the precast project. Eventually, to reduce and eliminate these issues, the proposed prototype will support appropriate deliveries, efficient monitoring, facilitation of coordination, and collaboration with improved communication. It is anticipated that this research will establish a unique perception in the precast construction industry, which will finally enhance its productivity, improve its efficiency, and maximise its effectiveness.

Item Type:Article
Uncontrolled Keywords:Architectural design, Cloud computing, Construction, Construction industry, Distributed computer systems, Information management, Information theory, Integration, Building Information Model - BIM, Collaboration, Context-Aware, Effective communication, Precast construction, Supply chain management, communication network, information system, integrated approach, literature review, numerical model, parallel computing, project assessment, questionnaire survey, stakeholder, supply chain management
Subjects:Q Science > Q Science (General)
Divisions:Civil Engineering
ID Code:74391
Deposited By: Widya Wahid
Deposited On:29 Nov 2017 23:58
Last Modified:29 Nov 2017 23:58

Repository Staff Only: item control page