Universiti Teknologi Malaysia Institutional Repository

The conceptual model of uncertainty factors in environmental issues on late delivery for construction industry

Zirawani, B. and Salihin, M. N. and Noorfa, H. M. (2013) The conceptual model of uncertainty factors in environmental issues on late delivery for construction industry. In: Advanced Materials Research.

Full text not available from this repository.

Official URL: http://dx.doi.org/10.4028/www.scientific.net/AMR.6...

Abstract

Every industry keen to maximize their company profit by fulfils the customer’s satisfaction by perform a very good project deliverable. However, very limited researches on uncertainty in environmental issues (EI) probably could turn as a biggest problem for company, especially in late delivery of project completion for construction industry (CI). Uncertainty factors could be mapped by many causes and affects which known or unknown, statically to totally ignorance. Previously, most of research on uncertainty have been model their factors of uncertainties but pay no attention to the EI, whereas in the real cases all the factors must controlled and manageable even it is in-deterministic or non-realistic. Therefore, the modelling of uncertainty factors in EI on late delivery for CI is very important to studied, and it will be considered to be used as the guidance for decision makers when they are facing of the problems that related to uncertainties. This paper will purpose the conceptual model on progress to the modelling of uncertainty factors in EI on late delivery for CI. The uncertainty of environmental can split into two categories; acts of God and acts of humans.

Item Type:Conference or Workshop Item (Paper)
Uncontrolled Keywords:construction industry
Subjects:Q Science > QA Mathematics > QA75 Electronic computers. Computer science
Divisions:Computing
ID Code:51346
Deposited By: Haliza Zainal
Deposited On:27 Jan 2016 01:53
Last Modified:20 Aug 2017 04:41

Repository Staff Only: item control page