Wong, Kuan Yew and Nikakhtar, Amin and Zarebidaki, Ali (2013) Document management in construction for shorter project lead time using web-based software. In: ICSDEC 2012: Developing the Frontier of Sustainable Design, Engineering, and Construction - Proceedings of the 2012 International Conference on Sustainable Design and Construction.
Full text not available from this repository.
Official URL: https://www.researchgate.net/publication/268467531...
Abstract
The efficiency improvement of construction projects depends on the effective communication among the project participants. However, the problem of communication occurs due to high amount and variety of information during the construction process. Thus, this study aims at applying Microsoft Office Groove as a method for reducing construction lead time and facilitating document management at the construction site. Lead times of the new method were compared with those of the conventional method of documentation in construction. Reduction in delivery time and lead time of the documentation process and improvement in communication between constructions participants are observed as the results of implementing the proposed method.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Uncontrolled Keywords: | Microsoft Office Groove, Document management in construction |
Subjects: | T Technology > TJ Mechanical engineering and machinery |
Divisions: | Mechanical Engineering |
ID Code: | 50994 |
Deposited By: | Haliza Zainal |
Deposited On: | 27 Jan 2016 01:53 |
Last Modified: | 29 Jun 2017 06:29 |
Repository Staff Only: item control page