Universiti Teknologi Malaysia Institutional Repository

Effect of handling time to supply chain management in construction industry

Omran Mohamed, Eyman A. (2014) Effect of handling time to supply chain management in construction industry. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.

Full text not available from this repository.

Abstract

Following its success in other sectors, the importance of supply chain management (SCM) has increasingly been recognized in the construction industry. Rationalization of activity in the supply chain process leads to a lowered production time and increased productivity. The instance of productivity in the structure of supply chain in the organization of resources and material flows, in ways of taking up decisions. This thesis describes the introduction of supply system and effectiveness of a simulation modeling approach by using project simulation process in construction. The purpose of this project is to simulate the transportation process of precast component from the suppliers (vendors) to the construction sites. It is in order to determine the factors which effect on the transportation process time. The required data had been collected by sending a questionnaire to the selected case study. The simulation model built by using Witness 2004 software, to simulate the current state of the project supply chain and come with improvement for future improvement. Through results of optimization are minimizing the transportation and handling time by controlling the factors that effect on the process. The analysis of the research results can be used to indicate an improvement needed for the supply chain systems for construction project operations

Item Type:Thesis (Masters)
Additional Information:Thesis (Sarjana Kejuruteraan (Awam - Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2014
Subjects:H Social Sciences > HD Industries. Land use. Labor
Divisions:Civil Engineering
ID Code:48414
Deposited By: Haliza Zainal
Deposited On:15 Oct 2015 01:09
Last Modified:27 Jul 2017 04:34

Repository Staff Only: item control page