Adnan, Mohd. Asrul (2013) Delay approval in Private Finance Initiative (PFI) project in Malaysia. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
|
PDF
454kB |
Abstract
Several studies had shown that many project managers are facing difficulties in predicting the approval of Private Finance Initiative (PFI) Project. This is due to the fact that there are many issue that can be linked to delay of approval in PFI Project. This study is carried out with the objectives to identify the cause of late approval in PFI Project, at the same time the impacts and strategies to minimize delay approval of PFI are also investigate. The main instrument of data collection was questionnaire survey with expects in the construction industry. The results show that there are eight causes, ten impacts and four solutions in the delay of approval in (PFI) Project. The degree of importance for these causes, impacts and the strategies to minor this problem will be determined through the questionnaire survey. From the findings of questionnaire survey the researcher will be able to identify the causes, impacts and the strategies to minor this problem delay approval in (PFI) Project.
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2013; Supervisor : Assoc. Prof. Ir. Dr. Rosli Mohamad Zin |
Uncontrolled Keywords: | construction projects, Malaysia, finance |
Subjects: | H Social Sciences > HG Finance |
Divisions: | Civil Engineering |
ID Code: | 33120 |
Deposited By: | Kamariah Mohamed Jong |
Deposited On: | 13 Sep 2013 01:13 |
Last Modified: | 25 Jul 2017 04:19 |