Ahmed, S.S. and Sarker, N.C. and Khairuddin, A.B. and Ghani, M.R.B.A. and Ahmad, H. (2003) A scheme for controlled islanding to prevent subsequent blackout. IEEE Transactions on Power Systems, 18 (1). pp. 136-143. ISSN 0885-8950
PDF
565kB |
Abstract
The power systems operated by the utilities in developing countries suffer from a large gap between demand and generation, inadequate transmission capacity, and nonuniform location of the load centers and generating stations. Occurrences of faults in such systems, in most of the cases, end up with the worst consequences (i.e., complete blackout). This paper illustrates the way a blackout can be prevented in real time through controlled segregation of a system into a number of viable islands together with generation and/or load shedding. The nature and location of any fault that warrants such islanding can be ascertained in real time through monitoring the active-power (megawatt) flows at both ends of a number of prespecified lines. The blackout of June 20, 1998 in the Bangladesh Power Development Board system has been used as an example in the illustration. The philosophy of the proposed islanding scheme may be considered for implementation in other power systems also.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Bangladesh controlled islanding scheme developing countries faults load shedding power system blackout prevention power system protection real time utilities |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Divisions: | Electrical Engineering |
ID Code: | 1886 |
Deposited By: | Dr Zaharuddin Mohamed |
Deposited On: | 16 Mar 2007 07:26 |
Last Modified: | 01 Jun 2010 02:59 |
Repository Staff Only: item control page