Universiti Teknologi Malaysia Institutional Repository

Comparison of new and previous Net Energy Metering (NEM) scheme in Malaysia

Razali, Abdul Hafiz and Abdullah, Md. Pauzi and Hassan, Mohammad Yusri and Hussin, Faridah (2019) Comparison of new and previous Net Energy Metering (NEM) scheme in Malaysia. Journal of Electrical Engineering, 18 (1). pp. 36-42. ISSN 0128-4428

[img]
Preview
PDF
670kB

Official URL: https://dx.doi.org/10.11113/elektrika.v18n1.141

Abstract

Net Energy Metering (NEM) scheme was introduced in Malaysia in 2016 to replace the previous Feed in Tariff (FIT) scheme. NEM allows electricity consumers to generate, use and export the net excess energy to the grid. For the net excess energy exported to the grid, the consumer will be paid base on the displaced cost per kWh unit. However, after two years of implementation, not many consumers engaged with the NEM scheme as compared to the previous FIT scheme due to the poor financial return. Beginning 2019, new NEM scheme (NEM 2019) is introduced to replace the previous NEM 2016 scheme. This paper will investigate the potential financial return of the new NEM 2019 in term of net present cost (NPC) and electricity cost savings. The analysis is conducted by using HOMER software on three different size of residential customers; large, medium and small. Different photovoltaic (PV) panel sizes ranging from 1kWp to 8kWp were used in the analysis. The results show that the NEM 2019 produced lower NPC as compared to NEM 2016 for most cases.

Item Type:Article
Uncontrolled Keywords:Net Energy Metering, Net Present Cost
Subjects:T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions:Electrical Engineering
ID Code:85261
Deposited By: Fazli Masari
Deposited On:17 Mar 2020 08:10
Last Modified:17 Mar 2020 08:10

Repository Staff Only: item control page