Lee, Ing Yi and Mohd. Yusof, Sha'ri (2007) Product quality improvement through Poka Yoke technique. Jurnal Mekanikal (23). pp. 74-82. ISSN 0127-3396
|
HTML
- Published Version
115kB | |
PDF (Full Text)
- Published Version
Restricted to Repository staff only 73kB |
Abstract
This paper focuses on a quality improvement project at JWS (company’s name abbreviated for confidentiality) using mistake proofing technique or Poka Yoke. The study is aimed at providing improvement ideas for existing problems at the manual assembly stations for product at D73A line. Investigations were conducted to identify causes of defects. Using results of unstructured interviews, and relevant data and from factory observations, the problem was analyzed using cause and effect diagram where the main causes were identified. To improve the existing problems, alternatives are generated using Poka Yoke and successive inspection techniques. Each alternative is evaluated in terms of its expected potential improvement and estimated cost of implementation. The evaluation indicates that Poka Yoke device proved to be the best alternative. This alternative was later presented to the company’s management for further evaluation and comments. The study culminates with proposed solutions to improve productivity at the factory and future study.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | poka yoke, quality improvement |
Subjects: | T Technology > TJ Mechanical engineering and machinery |
Divisions: | Mechanical Engineering |
ID Code: | 8118 |
Deposited By: | Norshiela Buyamin |
Deposited On: | 27 Mar 2009 07:39 |
Last Modified: | 03 Dec 2013 03:39 |
Repository Staff Only: item control page