Idris, N. and Zainuddin, Z. M. (2016) A simultaneous integrated model with multiobjective for continuous berth allocation and quay crane scheduling problem. In: 3rd International Conference on Industrial Engineering, Management Science and Applications, ICIMSA 2016, 23 May 2016 through 26 May 2016, South Korea.
Full text not available from this repository.
Official URL: https://www.scopus.com/inward/record.uri?eid=2-s2....
Abstract
This paper presents the simultaneous integration model of berth allocation and quay crane scheduling. Berths and quay cranes are both critical resources in port container terminals. The mathematical model uses a mixed integer linear programming with multiple objectives generated by considering various practical constraints. Small data instances have been taken to validate the integrated model. A numerical experiment was conducted by using LINGO programming software to evaluate the performance and to obtain the exact solution of the suggested model.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Uncontrolled Keywords: | Berth allocation, Integration, Multi objectives, Quay crane scheduling |
Subjects: | Q Science > QA Mathematics |
Divisions: | Science |
ID Code: | 73167 |
Deposited By: | Muhammad Atiff Mahussain |
Deposited On: | 29 Nov 2017 23:58 |
Last Modified: | 29 Nov 2017 23:58 |
Repository Staff Only: item control page