Cost performance and change managementcapability level of contractors: A relational quantitative study

Ajayi, Arowosegbe A. and Mohamed, Sarajul Fikri (2015) Cost performance and change managementcapability level of contractors: A relational quantitative study. Advanced Science Letters, 21 (5). pp. 1553-1556. ISSN 1936-6612

Full text not available from this repository.

Official URL: http://dx.doi.org/10.1166/asl.2015.6099

Abstract

Project changes are very common and inevitable; hence they constitute high level of risk that contributes to projects failure. However, project change cost is observable to be one of the most sensitive aspects of construction project management and it is also one of the most difficult to control. It has been recognized that higher capability maturity levels leads to better and consistent performance and that projects that adopts change management capability maturity level as a criterion for contractor’s pre-qualification incurs lower costs overrun on project budgets. Therefore, examining the relationship between the change management capability maturity level of contractors and cost performance of building projects is the focus of this research. Adopting a questionnaire survey, data collected from respondents were analyzed using importance index, fuzzy synthetic evaluation, spearman’s rank correlation and multiple regression to investigate the impact which overall CMCML of contractors will have in mitigating project cost overrun. The research findings reveal that the project cost overrun is negatively related to CMCML of contractor as evidenced by the co-efficient of determination R2 =−0.305 (i.e., as CMCML increases, project cost overrun decreases). In addition, the result further indicates that there is a strong negative relationship between CMCML and project cost overrun going by the spearman’s rank correlation coefficient value of −0.618. The established model is capable of predicting contractors’ CMCML thus making it possible to forecast contractor’s likelihood of performance in terms of cost. Moreover, the developed model will enhance easy elimination of incompetent contractors prior to contract award thus creating a fairer competition among contractors.

Item Type:Article
Uncontrolled Keywords:capability, change management, contractors, cost, fuzzy synthetic, project change
Subjects:T Technology > TH Building construction > TH434-437 Quantity surveying
Divisions:Built Environment
ID Code:58177
Deposited By: Haliza Zainal
Deposited On:04 Dec 2016 04:07
Last Modified:22 Aug 2021 07:33

Repository Staff Only: item control page