Baharum, Zirawani and Mustaffa, Noorfa Haszlinna and Ngadiman, Mohd. Salihin and Yacob, Azliza (2012) Modelling uncertainty factors in environmental issues on late delivery for construction industry: a propose. Lecture Notes of the Institute for Computer Sciences, Social-Informatics and Telecommunications Engineering, 62 LNI . pp. 182-187. ISSN 1867-8211
Full text not available from this repository.
Official URL: http://dx.doi.org/10.1007/978-3-642-32573-1_29
Abstract
A very limited research of fixing uncertainties in environmental issues (EI) actually encountered biggest problems for company, especially in late delivery (LD) of project completion for construction industry (CI). Uncertainty could be happens causes by many factors which known or unknown, statically to totally ignorance. Many factors of uncertainties have been modelled in previous research by ignored factors in EI. However, in the real cases all the factors must be manage even it is in-deterministic. Therefore, the modelling of uncertainty factors in EI for CI is very important to be studied, and it will be considered to be used as guidance for decision makers while they are facing with the problems that related to uncertainties. The uncertainty of EI can split into 2 categories; acts of God and acts of humans.. Preliminary result of conceptual model for uncertainty factors in EI is presented according to previous case study.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | modelling, uncertainty, environment issues |
Subjects: | Q Science > QA Mathematics |
Divisions: | Computer Science and Information System |
ID Code: | 47237 |
Deposited By: | Narimah Nawil |
Deposited On: | 22 Jun 2015 05:56 |
Last Modified: | 31 Mar 2019 08:35 |
Repository Staff Only: item control page