Universiti Teknologi Malaysia Institutional Repository

Determination of factors of delays in construction project by using linked bar chart planning method : a case study

Hew, Kin Yoong (2000) Determination of factors of delays in construction project by using linked bar chart planning method : a case study. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.

Full text not available from this repository.


Item Type:Thesis (Masters)
Additional Information:Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia, 2000
Subjects:K Law > KF United States Federal Law
Divisions:Civil Engineering
ID Code:43457
Deposited By: Haliza Zainal
Deposited On:02 Nov 2014 03:35
Last Modified:02 Nov 2014 03:35

Repository Staff Only: item control page