Universiti Teknologi Malaysia Institutional Repository

Minimizing makespan and total weighted tardiness for job shop scheduling problem using shifting bottleneck heuristic

Salim, Sutinah (2004) Minimizing makespan and total weighted tardiness for job shop scheduling problem using shifting bottleneck heuristic. In: Simposium Kebangsaan Sains Matematik, 2004, n/a.

Full text not available from this repository.


Item Type:Conference or Workshop Item (Paper)
Subjects:Unspecified
Divisions:Others
ID Code:20783
Deposited By: Liza Porijo
Last Modified:28 Dec 2011 15:56

Repository Staff Only: item control page