Universiti Teknologi Malaysia Institutional Repository

Faktor-faktor kritikal yang mempengaruhi tempoh penyiapan projek-projek Jabatan Kerja Raya

Embong , Samri (2010) Faktor-faktor kritikal yang mempengaruhi tempoh penyiapan projek-projek Jabatan Kerja Raya. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.

Full text not available from this repository.


Item Type:Thesis (Masters)
Additional Information:Supervisor : Prof. Madya Ir. Dr. Rosli Mohamad Zin; Thesis (Sarjana Sains (Pengurusan Pembinaan)) - Universiti Teknologi Malaysia 2010
Subjects:T Technology > TA Engineering (General). Civil engineering (General)
Divisions:Civil Engineering
ID Code:16420
Deposited By: Ms Zalinda Shuratman
Last Modified:24 Oct 2011 08:40

Repository Staff Only: item control page