Achieving rapid construction using lean principles

Yahya, Muhammad Azani and Mohamad, Mohamad Ibrahim (2009) Achieving rapid construction using lean principles. In: International Symposium on Construction in Developing Economies: Commonalities Among Diversities, 2009, Universiti Sains Malaysia, Pulau Pinang.

[img]
Preview
PDF
3MB

Official URL: https://www.irbnet.de/daten/iconda/CIB18144.pdf

Abstract

This research is conduct as an attempt to answer the question of adopting lean principles to achieve rapid construction. The general approach within lean construction is to make the construction process as it is normally undertaken on the construction site and leaner by reducing non-value generating activities. The reason on why the lean principles are used into rapid construction is to solve the chronicle and congested activities within the time frame of the rapid construction projects. Five principles of lean were made into comparison in the review of three case studies. In many applications of construction technology, the use of rapid construction method components signiJcantly decreased the construction time required for the project. From this researclt, the lean principles signijied that it can be adopted in rapid construction projects. The most significant benefit Itas been seen in areas where systems have been using it repeatedly. The sharing benejits from lean principles into rapid construction are the shorten of order fuljilment leading times, less project downtime, more innovation and true reduce the chronicle predecessor. Th~ research has also identified eight critical factors of integrating lean with rapid construction that are proven successful which are: I) planning it right, 2) understanding the whole lye construction cycle in non price factor view, 3) utilize knowledge and expertise, 4) integrate the team by working wifh the end to end supply chain in an integrated manner, 5) understand the end to end process, 6) measure performance to include reporting in your own performance, 7) training and 8) benchmarking.

Item Type:Conference or Workshop Item (Paper)
Uncontrolled Keywords:lean principles, rapid construction, signficant
Subjects:T Technology > TA Engineering (General). Civil engineering (General)
Divisions:Civil Engineering
ID Code:14717
Deposited By: Narimah Nawil
Deposited On:14 Sep 2011 04:50
Last Modified:05 Jul 2022 04:07

Repository Staff Only: item control page