Universiti Teknologi Malaysia Institutional Repository

An optimization in management of inventory system for pipeline : a case study

Mohd. Arshad, A. and Mohd. Dakir, A. (2008) An optimization in management of inventory system for pipeline : a case study. Journal of Chemical & Natural Resources Engineering, 2 . pp. 28-35. ISSN 1823-5255

[img]
Preview
PDF - Published Version
4MB

Abstract

This study was designed to investigate the issues contributing to the inventory shortages that keep on arise faced by local oil service company located in Terengganu. These problems resulted in various setbacks that influenced the overall performance of the piping service. These setbacks are categorized to three; risk, fiscal and reputation. In this study, statistical analysis was performed on the historical inventory records dated from 1'st January of 2004 till 1'st January 2008 obtained from the company. The output retrieved is the period of each project and the lead time distribution over the extent of 12 months, which is presented in the form of "descriptive statistics". In addition to that, interview sessions were conducted with the managerial and personnel involved in the project to determine the factors contributing to the inventory issue. As a result of this study, forecast of future project plan is forwarded on ARIMA, a Time Series forecasting technique, in order for improving the efficiency in inventory management.

Item Type:Article
Additional Information:Productivity Improvement through Optimization
Uncontrolled Keywords:pipeline, inventory system, project management
Subjects:H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions:Chemical and Natural Resources Engineering
ID Code:12238
Deposited By: Zalinda Shuratman
Deposited On:18 Apr 2011 02:11
Last Modified:18 Apr 2011 02:11

Repository Staff Only: item control page